PCA(D)(2023)6 – Amendment No. 162 to the SDR – Determination I minor corrections

Posted by: Susan Osbaldstone - Posted on:

Amendment No. 162 to the SDR, which will be effective from 1 November 2023, makes minor corrections to the following Determination I items:

  • Item 3-(e) Posterior Composite Supplement;
  • Item 4-(g) Resin Retained Bridge; and
  • Item 8- Domiciliary Visit and Recalled Attendance.

The PCA memorandum and the full SDR can be viewed and downloaded below.